The Rolkon team continued with its water main installation in Efaye, Wartburg.
In the second phase of this project for Icon Construction the Rolkon team installed 1 x 450mm, 2 x 400mm and 1 x 200mm diameter water main sleeves.
Rocky conditions and the crossing of a busy highway made no difference to the efficiency of the delivery and in our client’s words “there was no fuss, no excuses, the project just happened.” The total length of the ducts was 60 meters and the installation included a 72m product pipe with stub and flanges.